Shared equipment rarely follows a single invoice to a single job. A defensible schedule keeps observed usage separate from the allocation rule.
A usable shared construction equipment costs file identifies the entity, period, currency, source systems, cutoff, preparer, and reviewer. Those details sound routine. They are also what let someone reopen the file next month without relying on memory.